The way things currently stand in the construction industry, every building we create is essentially a prototype.
to foster improvement in workforce productivity and greater technology adoption by the industry.. DfMA has been on the radar in Singapore since at least 2014 when it was identified as a key component of the second.Building Information Modelling (BIM) Roadmap issued by BCA.

In 2015, the Singapore Government published the.Essential Guide to BIM for DfMA.which was authored by Bryden Wood in conjunction with BCA.

The Guide was intended to demonstrate the opportunities that DfMA (and particularly PPVC) could bring to projects, but also to consider and explain typical BIM considerations that should be taken at each stage of a DfMA project to set it up for success..Essential Guide to BIM for DfMA.

presented several early adopter case studies in Singapore with a focus on PPVC.
BCA subsequently identified PPVC as a preferred DfMA approach as embodied in the.Some progress can be made intra-company, other parts require innovation in the supply and waste chains.
Technological solutions need regulatory change, and other parts will need cross-sector collaboration.. To address the problem requires significant investment in capital and resources.In short, a complex problem and therefore there are dilemmas.
Feedback from the participants demonstrated that the problem is seen as a priority within their business/sector.This is not ubiquitous, and, in some sectors, there is a lack of market demand and economic momentum..